Solomon Builds the Temple

(A)Then Solomon began to build the house of the Lord in Jerusalem (B)on Mount Moriah, where the Lord[a] had appeared to David his father, at the place that David had appointed, (C)on the threshing floor of Ornan the Jebusite. He began to build in the second month of the fourth year of his reign. These are Solomon's (D)measurements[b] for building the house of God: (E)the length, in cubits[c] of the old standard, was sixty cubits, and the breadth twenty cubits.

Read full chapter

Footnotes

  1. 2 Chronicles 3:1 Septuagint; Hebrew lacks the Lord
  2. 2 Chronicles 3:3 Syriac; Hebrew foundations
  3. 2 Chronicles 3:3 A cubit was about 18 inches or 45 centimeters

Solomon Builds the Temple(A)

Then Solomon began to build(B) the temple of the Lord(C) in Jerusalem on Mount Moriah, where the Lord had appeared to his father David. It was on the threshing floor of Araunah[a](D) the Jebusite, the place provided by David. He began building on the second day of the second month in the fourth year of his reign.(E)

The foundation Solomon laid for building the temple of God was sixty cubits long and twenty cubits wide[b](F) (using the cubit of the old standard).

Read full chapter

Footnotes

  1. 2 Chronicles 3:1 Hebrew Ornan, a variant of Araunah
  2. 2 Chronicles 3:3 That is, about 90 feet long and 30 feet wide or about 27 meters long and 9 meters wide