1 Kings 6:1-2
World English Bible
6 In the four hundred and eightieth year after the children of Israel had come out of the land of Egypt, in the fourth year of Solomon’s reign over Israel, in the month Ziv, which is the second month, he began to build Yahweh’s house. 2 The house which king Solomon built for Yahweh had a length of sixty cubits,[a] and its width twenty, and its height thirty cubits.
Read full chapterFootnotes
- 6:2 A cubit is the length from the tip of the middle finger to the elbow on a man’s arm, or about 18 inches or 46 centimeters.
1 Kings 6:1-2
Amplified Bible
The Building of the Temple
6 [a]Now it came about in the four hundred and eightieth year after the Israelites came out of the land of Egypt, in the fourth year of Solomon’s reign over Israel, in the month of Ziv (April-May) which is the second month, that he began to build the Lord’s house (temple). 2 The length of the house which King Solomon built for the Lord was [b]sixty cubits (90 ft.), its width twenty (30 ft.), and its height thirty cubits (45 ft.).
Read full chapterFootnotes
- 1 Kings 6:1 This is a key verse in determining the date of the exodus of the Jews from Egypt. Since the fourth year of Solomon’s reign is believed to be 966 b.c., the date of the exodus was about 1446 b.c.
- 1 Kings 6:2 A cubit is about 18 inches.
1 Kings 6:1-2
New King James Version
Solomon Builds the Temple(A)
6 And (B)it came to pass in the four hundred and [a]eightieth year after the children of Israel had come out of the land of Egypt, in the fourth year of Solomon’s reign over Israel, in the month of [b]Ziv, which is the second month, (C)that he began to build the house of the Lord. 2 Now (D)the house which King Solomon built for the Lord, its length was sixty cubits, its width twenty, and its height thirty cubits.
Read full chapterFootnotes
- 1 Kings 6:1 So with MT, Tg., Vg.; LXX fortieth
- 1 Kings 6:1 Or Ayyar, April or May
1 Kings 6:1-2
New International Reader's Version
Solomon Builds the Temple
6 Solomon began to build the temple of the Lord. It was 480 years after the Israelites came out of Egypt. It was in the fourth year of Solomon’s rule over Israel. He started in the second month. That was the month of Ziv.
2 The temple King Solomon built for the Lord was 90 feet long. It was 30 feet wide. And it was 45 feet high.
Read full chapter
1 Kings 6:1-2
Contemporary English Version
The Outside of the Temple Is Completed
6 Solomon's workers started building the temple during Ziv,[a] the second month of the year. It had been 4 years since Solomon became king of Israel, and 480 years since the people of Israel left Egypt.
2 The inside of the Lord's temple was 27 meters long, 9 meters wide, and 13.5 meters high.
Read full chapterFootnotes
- 6.1 Ziv: The second month of the Hebrew calendar, from about mid-April to mid-May.
by Public Domain. The name "World English Bible" is trademarked.
Copyright © 2015 by The Lockman Foundation, La Habra, CA 90631. All rights reserved.
Scripture taken from the New King James Version®. Copyright © 1982 by Thomas Nelson. Used by permission. All rights reserved.
Copyright © 1995, 1996, 1998, 2014 by Biblica, Inc.®. Used by permission. All rights reserved worldwide.
Copyright © 1995 by American Bible Society For more information about CEV, visit www.bibles.com and www.cev.bible.